Ventilation for railway tunnel stretching 16 kilometers around London, servicing
11 stations in total.
Design, supply, test and commissioning of tunnel ventilation.
One of the largest construction project in Europe.
The client required a ventilation solution that was able to be used for cooling the tunnel as well as have smoke control capabilities in case of a fire.
Emirates Stadium HUB Sports Hall Fan Replacement
Woods Air Movement supplied replacement extract fans for the HUB Sports Hall at Emirates Stadium, overcoming extended motor lead times without compromising the required ventilation duty.
Read more
Light Rail Tunnel, Minnesota
The project represents a 14.5 mile extension of an underground light rail application in Minnesota Area.
Read more